Keelings Facilites Construction

This two part project consisted of the construction of a Modular Office and Facilities building in tandem with the development of a Food Distribution Warehouse.

Contact
KeelingsFacilitiesBuilding.jpeg
Keelingsexterior-e1552300021803-1024x764
Keelings-canteen-1024x768.jpg
Keelings-reception-1024x768.jpg
96724350_2780165485550942_35724321203893

Keelings Food Distrobution Warehouse

The Building was manufactured off-site  and completed on time and to budget within a 12- week programme.

Special features include 4800mm high Front Façade and parapet details.

  • Triple Glazed acoustic windows

  • Full internal Fit Out

  • M+E installation

  • Suspended Ceiling

  • Quality joinery and hardware

  • Toilets and Locker Facilities

KeelingsFacilitiesBuilding.jpeg

Keelings Facilities Building

The Project consisted of the design, construction of 800mtr2 Head office and facilities building. 

The building was manufactured and complete within a 16-week programme and was completed 3 weeks in advance of the proposed deadline. 

The proximity of the site to Dublin airport leads to an emphasis on Acoustics, and to minimize incoming aircraft noise. To combat this we included a fixed window system using High Acoustic Quality Glass and Frames. External walls were specially adapted to offer a dB rating of 65dB.



Keelingsexterior-e1552300021803-1024x764
Keelingsexterior-e1552300021803-1024x764

press to zoom
96724350_2780165485550942_35724321203893
96724350_2780165485550942_35724321203893

press to zoom
Keelings-canteen-1024x768.jpg
Keelings-canteen-1024x768.jpg

press to zoom
Keelingsexterior-e1552300021803-1024x764
Keelingsexterior-e1552300021803-1024x764

press to zoom


The facility also included:

  • Luxury Internal Finishes

  • Electrical Fit-Out

  • Air Condition and Fresh Air Intake


Internal Fit-out included:

  •  Double Glazed Partitions

  • High-Quality Doors and Finishes

  • Interface Carpets, Flooring, and complete Furniture Package

  • Fully service Cooking Kitchen and Canteen was developed with Caterex and supplied as part of our remit

The building was also constructed to support a future second and third floor.